27 Ductless Units Bring St. John the Baptist Church Back to Comfortable Sundays
St. John the Baptist Church in Quincy was dealing with an outdated system that made services difficult during warmer weather. Peach Heat and Cool installed 27 two-ton ductless mini-split units, giving the church a practical way to heat and cool the building without major interior ductwork.
The project also came with $112,000 in Mass Save incentives, dramatically reducing the church’s installation cost. With video footage showing the project inside and out, this is one of our strongest examples of what ductless mini-split installation can do for large community spaces.
